Loading...
Testwale Logo

FAQ

How long will it take for my account to be activated once the payment is made?

Once the payment is made, your account will be activated right away.

Pages are not loading properly.

Try checking your internet connection or restart your phone. If the problem still persists, take a screenshot and send us at [email protected], we will look into it.

How can I reset my password?

For the users registered with their mobile number, follow the following steps for resetting your password: 1. You need to enter your mobile number on the log-in page. 2. Click "Forget Password", to get an OTP on your registered number. 3. Using the OTP received on your number, you can now reset your password.

Pages are not loading properly.

Try checking your internet connection or restart your phone. If the problem still persists, take a screenshot and send us at [email protected], we will look into it.

How can I change the language of the article and quizzes?

We have a "Change Language" option in Test Series and Daily Quizzes. If you want the content (test and quiz) in Hindi/English language, go to Settings -> Change Language, to change your default language from Hindi to English or Vice-Versa.

I am unable to make payment for the pass.

In case of failure of a transaction before the amount deduction, we advise the student to try making the payment again. In case of transaction failure after amount deduction either access to the purchased product will be provided within few hours or we request the student to wait for 3 to 4 working days. The money will be credited back to his/her account.

I have made the payment but the tests are not unlocked.

Although rare, if so: You can directly mail us at [email protected] and we will resolve your issue.

What are all the payment methods allowed to buy a plan?

You can pay using: Credit Card/ Debit Card or Through: UPI and Netbanking.

What happens if I get disconnected during a test?

Don't worry! We auto-pause your test so, you can resume the test where you left. The test can also be manually paused by clicking on the "Pause" icon on the top left corner inside the timer circle. Please note: This function is not available in a Live Test.

What are the benefits of the subscription?

Here you will get access to test series and quizzes by top Educators. This will evaluate your learning and measure your progress.

  • Home
  • Current Affairs
  • DAILY CURRENT AFFAIRS:PM Modi launches Power Sector’s Revamped Distribution Sector Scheme

PM Modi launches Power Sector’s Revamped Distribution Sector Scheme

Tags: National Economy/Finance

Prime Minister Narendra Modi participated in the Grand Finale marking the culmination of ‘Ujjwal Bharat Ujjwal Bhavishya – Power @2047’ on 30th July 2022 through video conferencing. 

He also launched   Power sector’s ambitious Revamped Distribution Sector Scheme, laid the foundation stone of various green energy projects of NTPC and launched the National Solar rooftop portal.

‘Ujjwal Bharat Ujjwal Bhavishya – Power @2047’  

  • ‘Ujjwal Bharat Ujjwal Bhavishya – Power @2047’ was organised across the country from 25th to 30th July 2022 as part of ongoing ‘Azadi Ka Amrit Mahotsav’.
  • It showcases the transformation in the power sector achieved in the last eight years. 
  • It aims to empower citizens by improving their awareness and participation in various power related initiatives, schemes and programmes of government.

 Revamped Distribution Sector Scheme

 It is the Union Ministry of power flagship Programme which is aimed at improving the operational efficiencies and financial sustainability of the DISCOMs ((Distribution Company of electricity) and Power Departments. 

 Outlay for the scheme 

  •  The scheme has an outlay of Rs 3 Lakh crore for a period of five years from 2021-22 to 2025-26

Aim of the scheme 

  •  It will provide financial assistance to DISCOMs (Distribution Company of electricity) for modernization and strengthening of distribution infrastructure, focusing on improvement of the reliability and quality of supply to end consumers. 
  • It also aims to reduce the AT&C (Aggregate Technical and Commercial) losses to pan-India levels of 12-15% and ACS-ARR (Average Cost of Supply - Average Revenue Realized) gap to zero by 2024-25 by improving the operational efficiencies and financial sustainability of all state-sector DISCOMs and Power Departments.

 NTPC Green projects launched and foundation stone laid by the PM

  • He also launched and laid the foundation of the green power projects of India’s largest power company, NTPC worth Rs 5,200 crore.
  • He inaugurated the 100 MW Ramagundam Floating Solar Project in Telangana and the 92 MW Kayamkulam Floating Solar Project in Kerala. 
  • The Ramagundam project is India’s largest floating solar PV (Photovoltaics) project with 4.5 lakh ‘Made in India’ solar PV modules. Kayamkulam project is the second largest floating solar PV project consisting of 3 lakh ‘Made in India’ solar PV panels floating on water.

Foundation of projects 

  • He laid the foundation of  the Green Hydrogen Blending Pilot Project at NTPC Kawas Township which will be India’s first Green Hydrogen Blending Project helping in reducing the usage of natural gas.

For detail kindly see 6 April 2022 post 

  • He laid the foundation of the Green Hydrogen Mobility Project at Leh, Ladakh is a pilot project and aims for five Fuel Cell Buses to be run in and around Leh.
  •  This pilot project would be the first deployment of Fuel Cell Electric Vehicles for public use in India.

For detail kindly see 14 June 2022 post 

  • He also laid the foundation of the 735 MW Solar PV Project at Nokh, in Jaisalmer, Rajasthan. 
  • It is India’s largest Domestic Content Requirement based solar project with 1000 MWp at a single location, deploying high-wattage bifacial PV Modules with tracker system. 

 National Solar rooftop portal 

  • The Prime Minister also launched a national solar rooftop portal, which will enable online tracking of the process of installation of rooftop solar plants, starting from registering the applications to release of subsidy in residential consumers’ bank accounts after installation and inspection of the plant.


Please Rate this article, so that we can improve the quality for you -

Search By Tags

Committee Festivals of India Russia-Ukraine Sports National Economy/Finance International Relations Government Schemes Popular Defence Books and Authors Science and Technology Summits Economics/Business Awards Person in news State News Important Days Sports News International News National News
serablock login_ch-testwale